Simple download service (Atom) of the dataset: ICPE or underground storage sites generating PM3 easements as part of a PPRT in the Nièvre (58)
收藏资源简介:
The PM3 easements result from the establishment of technological risk prevention plans (RTPPs) designed to limit the effects of accidents likely to occur in facilities classified for the protection of the environment (ICPE) listed in the list provided for in Article L. 515-8 of Article L. 515-8 of the Environmental Code or in the underground storage facilities referred to in Article 3-1 of the Mining Code and which may cause effects on public health, public health and safety directly or by pollution of the environment. These plans define, around such facilities or storages, a perimeter of exposure to risks. Within this perimeter, PPRTs can: — delimiting areas in which the construction of developments or works and new constructions and the extension of existing buildings are prohibited or subject to compliance with requirements relating to construction, use or operation, — provide, within those areas, on the one hand, areas in which a right of abandonment of buildings or parts of buildings existing on the date of approval of the plan, on the other hand, may be established for areas where expropriation is possible, — prescribing measures for the protection of populations (including work on the existing building) to be taken by owners, operators and users within the time limits specified in the plan. This resource describes locally ICPEs or underground storage sites generating PM3 easements
PM3地役权(PM3 easements)源于技术风险防控计划(RTPPs)的制定,此类计划旨在限制两类设施可能发生的事故所造成的影响:一类是《环境法典》(Environmental Code)第L.515-8条所规定的名录中所列的环境分级保护设施(ICPE),另一类是《矿业法典》(Mining Code)第3-1条所提及的地下储存设施;上述设施或储存设施可能直接或通过环境污染对公众健康与公共卫生安全造成损害。 此类计划会在上述设施或储存设施周边划定风险暴露边界。 在该边界范围内,PPRTs可开展以下操作: — 划定特定区域:该区域内的开发工程、新建建筑及既有建筑扩建行为均被禁止,或需遵守与建设、使用或运营相关的合规要求; — 在上述区域内,一方面可为计划获批当日已存在的建筑或建筑局部设立征收放弃权对应的范围,另一方面可为具备征收可行性的区域确立相关权利; — 规定业主、运营方与使用方需在计划载明的时限内采取人口保护措施(包括既有建筑的相关改造工程)。 本数据集详述了会产生PM3地役权的地方级环境分级保护设施及地下储存场址。



