遇见数据集

Genehmigungsbedürftige Anlagen

收藏
data.europa2024-06-12 更新2024-06-26 收录
官方服务:

资源简介:

Approval decisions of the Appendices to be approved under the formal procedure (Appendixes of type G procedure from Annex 1 to 4. BImSchV). Installations subject to authorisation, listed in Annex 1 to the 4. BImSchV in column d are marked with a G. I.e. Appendices under the formal procedure (Appendixes of type E and G from Annex 1 to 4. BImSchV) is to be approved. Currently, only installations in the area of competence of the Trade Inspectorate (no representation of the installations in the area of competence of the LBEG and the lower immission protection authorities) are presented. appendices to be approved under the formal procedure (Appendixes of type E and G of Annex 1 to 4. BImSchV). Article 24 of the IE Directive lays down rules on access to information and public participation in the authorisation procedure. These rules were taken into account when transposing the IE Directive into national law in an article law which also amended the BImSchG accordingly. Since then, the approval notice and the name of the relevant BAT reference document for installations according to the Industrial Emissions Directive have to be made publicly available on the Internet. Lower Saxony goes a little further in this map and publishes here the approval notices of all projects to be approved under the formal procedure (Annexes to procedure type G from Annex 1 to 4. BImSchV). The current approval notice is always set, which would be replaced accordingly by a successor. An authorisation history is not provided here. Visible in the interactive map presentation are all installations of procedure type G that require approval. The current approval notices have been issued since December 2014. The data is updated daily.

依据正式审批程序需获批的附件(源自《联邦污染防治条例》(BImSchV)附件1至4中的G类程序附件)的审批决定。 列入《联邦污染防治条例》(BImSchV)附件1至4中d栏的需获批装置均标记有字母G。换言之,正式审批程序下的附件(即《联邦污染防治条例》(BImSchV)附件1至4中的E类与G类程序附件)均需获得审批。目前本数据集仅收录隶属于贸易监察局管辖范围内的装置,未包含下萨克森州矿业、能源与地质局(Landesamt für Bergbau, Energie und Geologie, LBEG)及下级污染防治主管部门管辖范围内的相关装置。 需依据正式审批程序获批的附件(即《联邦污染防治条例》(BImSchV)附件1至4中的E类与G类程序附件)。 《工业排放指令》(Industrial Emissions Directive, IE Directive)第24条规定了信息获取与公众参与审批程序的相关规则。 在将《工业排放指令》转化为国内法的过程中,上述规则已被纳入考量,相关国内法条款同时也对《联邦污染防治法》(BImSchG)作出了相应修订。 自此之后,针对符合《工业排放指令》要求的装置,其审批公告及相关最佳可行技术参考文件(Best Available Techniques Reference Document, BAT Reference Document)的名称必须在互联网上公开。 在下萨克森州的本互动地图中,相关公开范围更进一步,此处发布了所有依据正式审批程序需获批的项目(即《联邦污染防治条例》(BImSchV)附件1至4中的G类程序附件相关项目)的审批公告。 本数据集始终展示最新的审批公告,该公告将由后续更新的审批公告取而代之,且此处不提供审批历史记录。 本互动地图展示了所有需获批的G类程序装置。最新的审批公告自2014年12月起开始发布,数据集每日更新。

创建时间:
2017-03-29
二维码
社区交流群
二维码
科研交流群
商业服务