XPlanung dataset BPL “Mitte-Zentrum Bahnhofsring (4th change)”
收藏官方服务:
资源简介:
The development plan (BPL) contains the legally binding determinations for the urban planning order. As a general rule, the development plan is to be developed from the land use plan. The data available are the development plan “Mitte-Zentrum Bahnhofsring (4th change)” of the municipality Graben-Neudorf from XPlanung 5.0. Description: Center-centre Bahnhofsring, 4th change.
开发规划(BPL)包含针对城市规划规程的具有法律约束力的规定。原则上,开发规划应基于土地利用规划编制。本次可用数据集为取自XPlanung 5.0平台的格拉本-诺伊多夫(Graben-Neudorf)市的"米特-岑特鲁姆·班霍夫斯林(第四次修订版)"开发规划。描述:班霍夫斯林中心区域,第四次修订。
创建时间:
2021-11-10



