遇见数据集

Data batch direct download service (WFS): Easements of Public Utility (SUP) PM3 in Côte-d’Or

收藏
data.europa2024-06-26 收录
官方服务:

资源简介:

The PM3 easements result from the establishment of technological risk prevention plans (RTPPs) designed to limit the effects of accidents likely to occur in facilities classified for the protection of the environment (ICPE) listed in the list provided for in Article L. 515-8 of Article L. 515-8 of the Environmental Code or in the underground storage facilities referred to in Article 3-1 of the Mining Code and which may cause effects on public health, public health and safety directly or by pollution of the environment. These plans define, around such facilities or storages, a perimeter of exposure to risks. Within this perimeter, PPRTs can: — delimiting areas in which the construction of developments or works and new constructions and the extension of existing buildings are prohibited or subject to compliance with requirements relating to construction, use or operation, — provide, within those areas, on the one hand, areas in which a right of abandonment of buildings or parts of buildings existing on the date of approval of the plan, on the other hand, may be established for areas where expropriation is possible, — prescribing measures for the protection of populations (including work on the existing building) to be taken by owners, operators and users within the time limits specified in the plan. This resource describes locally ICPEs or underground storage sites generating PM3 easements

PM3地役权(PM3 easements)源于技术风险预防计划(RTPPs)的制定,该类计划旨在限制两类设施发生潜在事故时的影响:一类是《环境法典》第L.515-8条规定名录中所列的环境防护类设施(ICPE),另一类是《矿业法典》第3-1条提及的地下储存设施;上述设施或储存设施可能通过直接途径或环境污染,对公众健康与公共安全造成危害。 此类计划会在上述设施或储存设施周边划定风险暴露边界。 在该边界范围内,PPRTs可实现以下功能: — 划定特定区域,该区域内禁止开展开发工程、新建建筑及扩建既有建筑,或要求相关活动必须符合建设、使用或运营相关规定; — 在上述区域内,一方面可为计划获批当日已存在的建筑或建筑局部划定可申请建筑拆除权的区域,另一方面可为可实施征收的区域设立相关权利; — 规定业主、运营方及使用方需在计划载明的时限内采取的人群保护措施(包括既有建筑修缮工作)。 本数据集旨在介绍会产生PM3地役权的本地环境防护类设施及地下储存场地。

二维码
社区交流群
二维码
科研交流群
商业服务