The Floods Directive, OSD
收藏资源简介:
The Floods Directive (Directive 2007/60/EC on flood risk assessment and management). The purpose of the Directive is to reduce the negative impact of floods by establishing guidelines for the assessment and management of flood risk. The Floods Directive is divided into three levels: 1. The Plantrin: The assessment and designation of areas where there is a potential significant flood risk or, where it is likely, 2. The Plantrin: Preparation of flood hazard maps and flood risk maps in the designated risk areas. 3. The Plantrin: Preparation of risk management plans for the designated risk areas. In the first plan step, general areas are designated and relate to sub-areas that can be flooded and where there may be damage of more than DKK 2 billion and where more than 500 addresses are affected. 2010-2015: 1. Plantrin (2010-2011) 2. Plantrin (2012-2013) 3. Plantrin (2014-2015) 2016-2021: 1. The Plantrin 2. The Plantrin 3. The Plantrin
《洪水指令》(2007/60/EC号关于洪水风险评估与管理的指令)。本指令旨在通过制定洪水风险评估与管理相关指南,降低洪水造成的负面影响。 本洪水指令分为三个层级: 1. Plantrin(Plantrin):对存在潜在重大洪水风险或极有可能发生重大洪水的区域开展评估与划定工作; 2. Plantrin(Plantrin):在已划定的风险区域内编制洪水灾害地图与洪水风险地图; 3. Plantrin(Plantrin):为已划定的风险区域编制风险管理计划。 在首个规划环节中,需划定一般性区域,此类区域涉及可发生洪水、可能造成超过20亿丹麦克朗(DKK)损失且影响超过500处地址的子区域。 2010年至2015年: 1. Plantrin(Plantrin)(2010-2011) 2. Plantrin(Plantrin)(2012-2013) 3. Plantrin(Plantrin)(2014-2015) 2016年至2021年: 1. The Plantrin 2. The Plantrin 3. The Plantrin



