遇见数据集

Six different cost functionals, all optimized to control saccades by tuning the weights, λ<sub><i>α</i></sub> for the contributing terms.

收藏
NIAID Data Ecosystem2026-03-12 收录
官方服务:

资源简介:

Each total cost includes the accuracy cost, but differs in the contribution from other kinematic terms. AD: accuracy and duration; AE: accuracy and energy; AED: accuracy, energy and duration; AEDL1: AED with Listing’s law at saccade offset only; AEDL2: AED with Listing’s law for the entire trajectory. The weights are the (two to four) free parameters for the optimal control.

创建时间:
2021-05-24
二维码
社区交流群
二维码
科研交流群
商业服务