Survey report 2000/01 summer season Authors - Gary Johnston / Paul Digney / AUSLIG
收藏Global Change Master Directory (GCMD)2026-04-25 收录
下载链接:
https://cmr.earthdata.nasa.gov/search/concepts/C1214314000-AU_AADC.html
下载链接
链接失效反馈官方服务:
资源简介:
Taken from sections of the report:
Introduction
The 2000/2001 Antarctic Geodesy Summer Program consisted of a number of distinct components. They included:
- ARGN reference mark surveys at Mawson and Davis.
- Orthometric height connections between the Mawson ARGN site (AUS064) and the Mawson TGBM (AUS258).
- Orthometric height connections between the Davis ARGN site (AUS099) and the Davis TGBM (AUS186).
- Connection by GPS to the Tide Gauge Benchmarks at Mawson, Davis and Larsemann Hills.
- Strengthen the Australian Antarctic Geodetic Network with GPS observations where possible.
- Establish a permanent Australian monument and connection to existing Chinese monuments in the Grove Mountains.
- Connect to Russian and Chinese Geodetic control points in the Larsemann Hills vicinity for datum unification.
- Derive ellipsoidal heights for lake benchmarks in the Vestfold Hills for the purpose of developing a geometric geoid model for that area.
The following report details the work completed in the 2000/2001 summer season, bu AUSLIG (Now Geoscience Australia) geodetic surveyors, Gary Johnston and Paul Digney between November 2000 and March 2001.
提供机构:
AU_AADC



