proposed wind park
收藏资源简介:
Plotted in plant of the lines of 66 kVA (medium voltage transport lines) that connect the thermal power plant of the Guinchos (Breña Baja) with the Mulato (San Andrés and Sauces) and the substation of Los Llanos de Aridane. The ownership of those of the lines belongs to REE (Electric Network of Spain) according to the Royal Decree Law 17/2007, of 4 July, confirmed the status of Red Eléctrica as a transmission system operator and attributed to it the function of single carrier, under exclusivity regime. In compliance with this law, Red Eléctrica acquired, in 2010, the assets of the Balearics and the Canary Islands and the rest of the peninsular assets pending transfer from the electricity companies.
本数据集绘制了66千伏安(中压输电线路)的线路走向,该线路将位于布雷尼亚巴哈(Breña Baja)的金乔斯(Guinchos)热电厂,与位于圣安德烈斯和绍塞斯(San Andrés and Sauces)的穆拉托(Mulato)变电站以及阿里达内平原(Los Llanos de Aridane)变电站相连。根据2007年7月4日发布的第17/2007号皇家法令,上述线路的所有权归属西班牙国家电网(REE, Electric Network of Spain);该法令明确了Red Eléctrica(西班牙国家电网公司)作为输电系统运营商的法定地位,并赋予其独家单一运营商的运营职能。为落实该法令要求,西班牙国家电网于2010年收购了巴利阿里群岛、加那利群岛的电力资产,以及其余待移交的半岛区域电力企业资产。



