five

A sustainable multi-objective multi-mode resource-constrained project scheduling problem solved by a new Reduced Bucket Search matheuristic algorithm

收藏
Figshare2025-12-26 更新2026-04-28 收录
下载链接:
https://figshare.com/articles/dataset/A_sustainable_multi-objective_multi-mode_resource-constrained_project_scheduling_problem_solved_by_a_new_Reduced_Bucket_Search_matheuristic_algorithm/30954037
下载链接
链接失效反馈
官方服务:
资源简介:
A Sustainable Multi-Objective Multi-Mode Resource-Constrained Project Scheduling Problem (Sustainable MO-MRCPSP) is proposed in this research, as a reformulation of the well-known NP-hard Multi-Mode Resource-Constrained Project Scheduling Problem (MRCPSP). The MRCPSP has several practical applications in industrial and business situations. In the traditional MRCPSP, the objective is usually to minimise the project makespan. Our proposal, however, incorporates economic, environmental, and social factors as simultaneous objectives, in order to provide a sustainable approach to the decision-making process, which is essential in the current competitive landscape. An Improved Augmented Epsilon-Constraint (AUG2) solution method and a new Reduced Bucket Search (RBS) matheuristic method are developed and tested on adapted benchmark instances of different sizes obtained from well-known libraries. Performance metrics show that the RBS matheuristic performs faster for larger instances, and provides similar convergence and solution diversity than the AUG2 method. Both the reformulation of the problem to incorporate the sustainable approach and the development of a new, efficient RBS solution method, designed to fit well for sequencing problems, provide valuable contributions to the scientific knowledge.
创建时间:
2025-12-26
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作