Planning for a future Murray River crossing at Swan Hill : community feedback summary report
收藏Research Data Australia2025-12-20 收录
下载链接:
https://researchdata.edu.au/planning-future-murray-summary-report/3848611
下载链接
链接失效反馈官方服务:
资源简介:
This report summarises Transport for NSW’s consultation with the Swan Hill and Murray Downs community and stakeholders about the preferred alignment of a future Murray River crossing at Swan Hill. Between Monday 14 September and Friday 13 November 2020, Transport for NSW called for community feedback and comments about two options for the alignment of a future bridge in Swan Hill. These two options are: 1. Option 9a, located about 120 metres upstream (east) of the existing bridge, and 2. McCallum Street Option, located at the existing bridge alignment at McCallum Street. All feedback received has been reviewed and is summarised in this report to help inform future planning for a future bridge.\n\n**Note:** This resource was originally published on opengov.nsw.gov.au. The OpenGov website has been retired. If you have any questions, please contact the Agency Services team at transfer@mhnsw.au\n\n**Agency**\n \n- Transport for NSW\n
本报告总结了新南威尔士州交通局(Transport for NSW)就天鹅山(Swan Hill)未来默里河(Murray River)跨河通道的优选路线,与天鹅山及默里当斯(Murray Downs)社区、利益相关方开展的咨询工作。2020年9月14日(周一)至11月13日(周五)期间,新南威尔士州交通局就天鹅山未来桥梁的两条路线方案面向社区征集反馈与意见。两项方案具体如下:1. 9a方案:位于现有桥梁上游(东侧)约120米处;2. 麦卡勒姆街(McCallum Street)方案:沿用麦卡勒姆街处的现有桥梁路线。本次征集到的所有反馈均已完成审核,并总结于本报告中,以期为未来桥梁的规划工作提供决策参考。
**备注:** 本资源最初发布于opengov.nsw.gov.au网站,该OpenGov平台现已停用。如有任何疑问,请通过transfer@mhnsw.au联系机构服务团队。
**发布机构**
- 新南威尔士州交通局(Transport for NSW)
提供机构:
data.nsw.gov.au



