CycleRap Results for West Midlands Cycle Lane
收藏资源简介:
These data are the encoded results of performing a cycleRAP survey along the A38, from Birmingham centre to the outskirts of Selly Oak. Note that the survey was conducted twice for the A38, along both the carriageway and then the adjacent cycle lane. In the context of these results we refer to these as the southbound and northbound data, respectively. The comparison of the northbound with the southbound data allows for the assessment of the safety improvement achieved through the introduction of the cycle lane. To understand these results and for a full explanation of the parameters, please consult the CycleRAP documentation as maintained by iRAP. Documentation can be found here: https://irap.org/cyclerap/ results/ File Description Coding_1724143829100.csv The raw encoding of the cycleRAP survey. Treatments_1724143823166.csv The suggested mitigations for each section of the survey. plots/ Visual summaries of the survey results. For each street there are five visualisations. File Suffix Description _ComponentAvgRisks.pdf Bar plot showing % breakdown of the contribution to total FSI of different road user groups _ComponentRisks.pdf Stacked plot showing the relative risk along the route for different types of road user incident. _CycleRAPperDistance_Current.pdf Histogram showing the CycleRAP score as a density per unit distance for the current situation. _CycleRAPperDistance_Current_vs_Forecast.pdf Histogram showing the CycleRAP score as a density per unit distance for both the current situation and the scenario in which all recommended treatments have been adopted. _CycleRAPGlobalScoreMap_Current_vs_Forecast.pdf Maps with CycleRAP score overlaid for both the current situation and the scenario in which all recommended treatments have been adopted.



