Remediation of hydropower
收藏资源简介:
The dataset contains information on the existing hydropower plants in the canton as well as on the state of play of measures to address the negative effects of the plants on fish ascent and descent. The data model is based on the minimal spatial data model “Planning and reporting of hydropower remediation” (ID 192, version 1.2). Note: In the canton of Basel-Stadt there are no facilities requiring refurbishment with regard to Schwall-Sunk. In the cantonal area, the relocation budget is significantly affected by the Birsfelden power plant only in the Rhine, and rehabilitation measures are being developed under the auspices of the Federal Office of Energy SFOE.
该数据集收录了该州境内现有水电站的相关信息,以及为应对水电站对鱼类洄游上下行造成的负面影响所采取的各类措施的当前进展。本数据集采用的数据模型基于最小空间数据模型《水电站修复规划与报告》(ID 192,版本1.2)。备注:在巴塞尔城市州境内,针对Schwall-Sunk的设施暂无需要翻新改造的项目。在该州辖区范围内,仅莱茵河上的比尔斯费尔登水电站对鱼类迁移相关预算产生显著影响;相关修复措施目前由瑞士联邦能源局(Federal Office of Energy, SFOE)牵头推进。



