2023 Updated Condition Data for Transportation Infrastructure
收藏官方服务:
资源简介:
The City of Bloomington Department of Public Works - Street Division recently contracted for a citywide assessment that analyzed the current condition of streets, sidewalks, sidepaths and accessible curb ramps. This project builds upon a similar effort that was last performed in 2017-2018 by the Public Works Department, with the support of the Office of Innovation, and updates the condition data that was collected at that time for these important transportation assets.
创建时间:
2023-06-01




