Utah FORGE: Ground Motion Study Report
收藏官方服务:
资源简介:
Paragon Geophysical contracted Urban Seismic Specialists to conduct A Ground Motion Study, on their Forge 3D project located near in Milford Utah .The test was conducted to measure the effects of the vibrator array on a pipeline owned by Kern River. Testing began November 22nd, and was completed on November 23rd. Demobilizing was completed on November 24, 2017
创建时间:
2018-06-15



