five

Production line dataset for task scheduling and energy optimization - Schedule Optimization

收藏
Zenodo2020-12-31 更新2026-05-25 收录
下载链接:
https://zenodo.org/record/4106745
下载链接
链接失效反馈
官方服务:
资源简介:
The case study of this dataset uses real production data, provided by a textile company that manufactures hang tags. Their working schedule is from 7h00 of Monday to 23h00 of Saturday. This dataset uses a period of 5 minutes for all task durations and energy data. The case study considers a six-day period from 7h00 of Monday to 23h00 of Saturday. The scheduling algorithm was used for three machines that share the same cell.<br> <br> The API can be found at &lt;http://www.gecad.isep.ipp.pt/api/spear/&gt;<br> <br> File Description: Input_JSON_Schedule_Optimization - JSON input data for the schedule optimization Output_JSON_Schedule_Optimization - JSON output data for the schedule optimization Output_Statistics_Schedule_Optimization - Excel output schedule optimization statistics
提供机构:
Zenodo
创建时间:
2020-11-05
二维码
社区交流群
二维码
科研交流群
商业服务