five

cr123869

收藏
GSQ Open Data Portal2026-03-28 收录
下载链接:
https://geoscience.data.qld.gov.au/dataset/cr123869
下载链接
链接失效反馈
官方服务:
资源简介:
RubyJo 151 is a vertical coal seam gas development well operated by QGC Pty Limited in PL 275. Refer to Figure 1. The aim of the well was to target, evaluate and produce coal seam gas in the Walloon Subgroup Coal Measures. RubyJo 151 was spudded on the 14 th of April 2013 and drilled by Weatherford Rig #8. The 17” conductor was drilled and cemented to 10.00mRT and the 12 ¼” surface hole weas drilled to 84.00m RT, cased and cemented to 81.50mRT with 9 5/8” casing. Weatherford #8 drilled the 8 ½” production section to a total depth of 679.00 m RT in the Eurombah Formation on the 16 th April 2013 and encountered coals in the Walloon Subgroup. One wireline log and 16” underreaming were conducted post drilling, and then 7” plain and pre-perforated production casing was run to 663.82 m RT and cemented from the ECP (360.32 RT) to surface, prior to the well being suspended on the 18th April 2013. A detailed account of the drilling operations is contained in the RubyJo 151 Well Completion Report (QDEX Company Report Number 78134). After drilling was completed, multiple completions, workovers, interventions, maintenance and production were conducted at RubyJo 151. A description of each of these activities is included in the Well History (Section 2.2), with corresponding details contained in the relevant Tables and Appendices. No stimulations, formation testing or additional cementing activities were conducted post drilling (except the P&A activities summarized below). RubyJo 151 produced a total 578.5 TJ (15.55MMm3 ) of gas and 12 ML of water over the total producing life of the well from September 2013 to February 2019. Production from this well pad area was still needed and a replacement well will be drilled with improved solids control well design, as such RubyJo 151 was plugged and abandoned. On the 27 tt July 2019, Easternwell Energy’s EWE #31 rig mobilized to RubyJo 151 for the purpose of abandoning the well downhole and reservoir / aquifer isolation. EWE #31 rigged up and removed the PCP and completion string. EWE #31 then performed a scraper run from 355-365 mRT. Weatherford then ran a cement evaluation wireline log and set a permanent bridge plug (BP) at 358 m RT in the 7” casing, which EWE #31 successfully pressure tested to 1500 psi for 10 minutes and tagged with 5klbs to confirm location. Auscoil cementing crew then rigged in pumped 26bbls of 14ppg cement slurry and pulled up out of hole above top of cement plug. Auscoil pumped second cement plug, 18.8 bbls of 14ppg cement and pulled out of hole to surface. WOC. Run in hole and tag TOC at 24.68 RT. Topped up well with cement to surface and rig released. Prior to commencing the upper wellhead abandonment, a routine daily surface gas test indicated 0% LEL at the wellhead, and a review of previous activities at RubyJo 151 confirmed the absence of pressure or flow behind the casing strings. The surface abandonment occurred on the 16th November 2020, when the TOC was confirmed, casing strings were cut at 1.80 m GL, removed, topped up with cement, capped, buried and P&A signage installed above the well. Expanded descriptions of each of these activities is included in the Well History (Section 2.2), with corresponding details contained in relevant Tables and Appendices. RubyJo 151 was plugged and abandoned in accordance with the ‘Petroleum and Gas (Production and Safety) Regulation 2004’ and ‘Code of Practice for the construction and abandonment of coal seam gas and petroleum wells, and associated bores in Queensland Petroleum and Gas Inspectorate Version 2 December 2019
提供机构:
geological-survey-of-queensland
创建时间:
2025-11-16
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作