遇见数据集

Soil Logs, grain size analysis, and water quality measurements at West Fork Hoquiam River Dam Removal and Groundwater Replacement Preliminary Design and Permitting project from 2024-04-29 to 2024-10-15 (NCEI Accession 0306762)

收藏
data.gov2025-12-20 收录
官方服务:

资源简介:

Drilling of the exploratory boreholes and installation of the monitoring well was completed by Anderson Environmental Contracting, LLC (AEC), using sonic drilling...

勘探钻孔钻探及监测井安装工作已由安德森环境承包有限责任公司(Anderson Environmental Contracting, LLC,简称AEC)采用声波钻探技术完成……

二维码
社区交流群
二维码
科研交流群
商业服务