Harbor negatives, 1953
收藏资源简介:
5 images. Harbor negatives, 24 August 1953. Shows extensive work being done on extension of Pier "A" Long Beach; Navy landing at Long Beach; Eloi Amar (General Manager, Long Beach Harbor).; Supplementary material reads: "Chernus -- Harbor. Add to Harbor Series layout. Captions: #40: Shows extensive work being done on extension Pier A, Long Beach, which sticks out like a probing finger into the water at Long Beach. #41: Shows ships tied up at Pier A, Long Beach. #43: Shows long row of ships tied up at Pier A, Berth 9 and 10. #44: Shows Navy landing at Long Beach which will [be] moved shortly because of subsidence. #45: Shows Eloi Amar, general manager of Long Beach Harbor Department and guiding genius who planned and built the port that oil made possible. He is beside one of the 950 oil wells which stud the Long Beach harbor area. Alex C. Early Sunday. Ahead please".
本数据集包含5张港口底片,拍摄于1953年8月24日。影像内容涵盖长滩A码头(Pier "A")扩建工程的大规模施工作业、长滩港(Long Beach Harbor)的海军登陆点,以及时任长滩港总经理的埃洛伊·阿马尔(Eloi Amar)。补充说明文本如下:「切努斯——港口主题。请将该素材纳入港口系列归档。具体标注如下:#40:展现长滩A码头扩建工程的繁忙施工场景,该码头如探入水面的探针般矗立在长滩港域。#41:展示系泊于长滩A码头的船舶。#43:展现系泊于长滩A码头9号与10号泊位的长列船舶。#44:展现长滩港的海军登陆点,该区域因地面沉降将于近期搬迁。#45:展现时任长滩港务局总经理、一手规划并建成依托石油产业发展的港口的核心推动者埃洛伊·阿马尔,他身旁是遍布长滩港域的950口油井之一。亚历克斯·C. 周日早些时候。请推进相关事宜。」