five

Optimizing Workover Rig Fleet Sizing and Scheduling Using Deterministic and Stochastic Programming Models

收藏
Figshare2018-08-17 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/Optimizing_Workover_Rig_Fleet_Sizing_and_Scheduling_Using_Deterministic_and_Stochastic_Programming_Models/6344282
下载链接
链接失效反馈
官方服务:
资源简介:
We present deterministic and stochastic programming models for the workover rig problem, one of the most challenging problems in the oil industry. In the deterministic approach, an integer linear programming model is used to determine the rig fleet size and schedule needed to service wells while maximizing oil production and minimizing rig usage cost. The stochastic approach is an extension of the deterministic method and relies on a two-stage stochastic programming model to define the optimal rig fleet size considering uncertainty in the intervention time. In this approach, different scenario-generation methods are compared. Several experiments were performed using instances based on real-world problems. The results suggest that the proposed methodology can be used to solve large instances and produces quality solutions in computationally reasonable times.
创建时间:
2018-08-17
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作