Testing DRIFT set-up on ID24-DCM for beamtime CH7064
收藏官方服务:
资源简介:
The DRIFT reactor will be mounted on ID24 and tested for the incoming beamtime CH7064. No beam is required. H2 20%, CO2 5%, CO 5% in He, O2 20% in He will be used for testing the reactor
创建时间:
2027-01-01



