Green Point Creek, Pearl Beach Floodplain Management Study
收藏Research Data Australia2025-12-20 收录
下载链接:
https://researchdata.edu.au/green-point-creek-management-study/3812752
下载链接
链接失效反馈官方服务:
资源简介:
The Green Point Creek system has been divided into component areas for application of a floodplain\r\nmanagement plan. The component areas, illustrated on Figure 13, cover:\r\n\r\n* Tourmaline Avenue Floodway Area;\r\n* Tourmaline Avenue - Flood-Liable Developed Area;\r\n* Crystal Avenue Floodway;\r\n* Tourmaline Avenue Culvert Area - currently flood-liable; and\r\n* Diamond - Tourmaline Avenue - Flood-Liable Developed Area.\r\n\r\nThe specific points applied in each of the above areas involve:\r\n\r\n* land use controls;\r\n* building development controls;\r\n* limited channel erosion protection under government funding;\r\n* the bulk of channel erosion protection by land owner finance; and\r\n* structural works, as outlined above with Tourmaline Avenue culvert replacement,\r\nfloodplain restoration and acquisition of one house.
绿点溪(Green Point Creek)水系已被划分为若干子片区,用于推进漫滩管理计划的实施。图13所示的子片区涵盖以下类别:
* 托马林大道(Tourmaline Avenue)泄洪通道区;
* 托马林大道——易受洪水侵袭建成区;
* 水晶大道(Crystal Avenue)泄洪通道;
* 托马林大道涵洞片区——当前易受洪水影响;
* 钻石(Diamond)——托马林大道——易受洪水侵袭建成区。
上述各片区所采用的具体管控举措包括:
* 土地使用管控;
* 建筑开发管控;
* 由政府资助的有限河道侵蚀防护工程;
* 由土地所有者出资承担的绝大部分河道侵蚀防护工作;
* 结构类工程,包括托马林大道涵洞更换、漫滩修复以及一处住宅征收工作,如前文所述。
提供机构:
data.nsw.gov.au



