five

Detroit Right of Way Permits Points

收藏
Detroit Open Data Portal2026-05-16 收录
下载链接:
https://data-detroitmi.hub.arcgis.com/datasets/detroitmi::detroit-right-of-way-permits-points
下载链接
链接失效反馈
官方服务:
资源简介:
<p>Right-of-way (ROW) permits help us plan and coordinate safe and effective use of our shared public roads, sidewalks, alley ways, and other thoroughfares. The term "public right-of-way" is used to describe land controlled by public agencies and includes streets, alleys, public sidewalks, curbs, and the area between the curb and sidewalk (the berm or green area), as well as the spaces above and below these ROW features. The vertically adjacent spaces are required for many uses of a right-of-way, including, for example to ensure overhead clearance for vehicles, and space for utility lines and other infrastructure objects.</p> <p>Work within the city's Right of Way is managed by the City Engineering Division of the Department of Public Works (DPW). In accordance with Detroit Code Section 43, Division 2, it is necessary to obtain a permit from the City Engineering Division, DPW prior to construction and other activities that will affect a street, alley, sidewalk, or berm/green area. This includes:</p> <ul> <li>Construction that involves altering or blocking a ROW, including Installing utilities like water mains, gas lines, telecommunications lines, installing water or sewer taps, replacing sidewalks, driveway approach, and so on.</li> <li>Occupying a ROW such that a temporary sidewalks,lane, or street closure is required, including for having a crane or other construction equipment in a ROW, filming, special events, dumpsters, and so on.</li> <li>Oversized or Overweight Loads.</li> </ul> <p>Learn more at <a href='https://detroitmi.gov/departments/department-public-works/right-way-permits-and-standards' rel='nofollow ugc'>DPW Right of Way Permits and Standards</a>.</p> <p>The Right of Way Permits data is available in tabular format. A point layer and line layer is also available to visualize where the permitted work is being performed. The point and line layers may have multiple rows for a single permit, the Application ID is the unique identifier for each RoW Permit Application.</p>
提供机构:
City of Detroit
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作