遇见数据集

Impact of reported translocation removals and estimated killing offtake. Orangutan killing estimates are calculated from the mean, minimum, and maximum rates in Meijaard et al. [61] and crime detection rates of 1.2%–10% from Sherman et al. [56].

收藏
Figshare2025-03-19 更新2026-04-28 收录
官方服务:

资源简介:

Impact of reported translocation removals and estimated killing offtake. Orangutan killing estimates are calculated from the mean, minimum, and maximum rates in Meijaard et al. [61] and crime detection rates of 1.2%–10% from Sherman et al. [56].

创建时间:
2025-03-19
二维码
社区交流群
二维码
科研交流群
商业服务