Plotted in plant of the lines of 66 kVA (medium voltage transport lines) that connect the thermal power plant of the Guinchos (Breña Baja) with the Mulato (San Andrés and Sauces) and the substation of Los Llanos de Aridane. The ownership of those of the lines belongs to REE (Electric Network of Spain) according to the Royal Decree Law 17/2007, of 4 July, confirmed the status of Red Eléctrica as a transmission system operator and attributed to it the function of single carrier, under exclusivity regime. In compliance with this law, Red Eléctrica acquired, in 2010, the assets of the Balearics and the Canary Islands and the rest of the peninsular assets pending transfer from the electricity companies.
提供机构:
Cabildo Insular de La Palma