遇见数据集

Redispatch

收藏
data.europa2022-03-17 更新2025-06-01 收录
官方服务:

资源简介:

Renewable energy generation plants need to be reduced in their feed-in due to grid constraints in order to ensure grid stability. This process is called **redispatch**. The data shall include information on the number of hours and the number of EEG installations that had to be reduced in order to ensure grid stability. *Both the data of current and forecast EEG measures have been compiled with the greatest possible care and prepared for presentation. Nevertheless, in particular recording and transmission errors as well as incomplete delivery by third parties cannot be excluded. Schleswig-Holstein Netz AG therefore expressly reserves the right to change the published data and presentations and assumes no liability for the topicality, completeness and correctness.* Visualisation of the data: https://www.netzampel.energy/shnetz

为保障电网稳定运行,可再生能源发电场站需因电网约束实施上网电量削减,该流程被称为**重调度(redispatch)**。 本数据集包含为保障电网稳定而执行电量削减的累计时长,以及需实施削减操作的EEG(Erneuerbare Energien Gesetz,德国可再生能源法)并网装机数量。 当前及预测性EEG相关数据均已以最高审慎标准编制并完成可视化呈现筹备。尽管如此,仍无法完全排除记录、传输误差及第三方交付不全等情形。因此,石勒苏益格-荷尔斯泰因电网公司(Schleswig-Holstein Netz AG)明确保留修改已发布数据及可视化成果的权利,且不对数据的时效性、完整性与准确性承担责任。 数据可视化链接:https://www.netzampel.energy/shnetz

创建时间:
2022-03-17
二维码
社区交流群
二维码
科研交流群
商业服务