five

Instances for the Job Sequencing and Tool Switching Problem with Non-identical Parallel Machines (SSP-NPM)

收藏
NIAID Data Ecosystem2026-05-02 收录
下载链接:
https://data.mendeley.com/datasets/6vxr354dpk
下载链接
链接失效反馈
官方服务:
资源简介:
The data presented here were used in computational experiments to evaluate the different mathematical models proposed for solving the Job Sequencing and Tool Switching Problem with Non-identical Parallel Machines (SSP-NPM), as described in the research article titled "Job sequencing and tool switching problem with non-identical parallel machines: mathematical formulations and modeling improvements" (Hadj Salem et al., 2025). We considered three sets of instances: Set I, Set II, and Set III. These comprise a total of 1,020 instances, which are divided into 22 subsets. Detailed information about the structure of the instances in Set-I and Set-II can be found in references Calmels, D. (2022a) and Calmels, D. (2022b), respectively. However, Set-III consists of newly generated random instances. It contains a total of 720 instances, divided into 18 subsets of 40 instances each, where |M| in {2,3}, |J| in {10,15,20}, and |T| in {10,15,20}. For each tuple (|M|, |J|, |T|), 4 density levels are generated with 10 instances per level. The density level varies between {20%,30%,40%,50%} and corresponds to the percentage of 1 in the tool requirement matrix. - Calmels, D. (2022a). A comparison of different mathematical models for the job sequencing and tool switching problem with non-identical parallel machines. International Journal of Operational Research, 45(4):419–441. (https://doi.org/10.1504/IJOR.2022.128396) - Calmels, D. (2022b). An iterated local search procedure for the job sequencing and tool switching problem with non-identical parallel machines. European Journal of Operational Research, 297(1):66–85. (https://doi.org/10.1016/j.ejor.2021.05.005)
创建时间:
2025-08-05
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作