遇见数据集

Electrical half hourly raw and cleaned datasets for Great Britain from 2008-11-05

收藏
Zenodo2024-08-19 更新2026-05-26 收录
数据链接:
官方服务:

资源简介:

<strong>A journal paper published in Energy Strategy Reviews details the method to create the data.</strong> <strong>https://www.sciencedirect.com/science/article/pii/S2211467X21001280</strong> <strong>2023-03-15: Version 8.0.1 is a major rewrite with column names that now include the units and the data type. Also, pumped storage has charging values included from 2012, i.e., the negative values when pumped storage is being charged, as well as the positive values when it was discharging (which were available previously). The raw version of the data (rather than cleaned) has been dropped for the time being.</strong> 2023-01-06: Version 7.0.0 was created. Now includes data for the Eleclink interconnector from Great Britain to France through the Channel Tunnel (https://www.eleclink.co.uk/index.php). This supersedes previous versions - as the Eleclink data is now included for historical data (including in the ESPENI total). 2021-09-09: Version 6.0.0 was created. Now includes data for the North Sea Link (NSL) interconnector from Great Britain to Norway (https://www.northsealink.com). The previous version (5.0.4) should not be used - as there was an error with interconnector data having a static value over the summer 2021. 2021-05-05: Version 5.0.0 was created. Datetimes now in ISO 8601 format (with capital letter 'T' between the date and time) rather than previously with a space (to RFC 3339 format) and with an offset to identify both UTC and localtime. MW values now all saved as integers rather than floats. Elexon data as always from www.elexonportal.co.uk/fuelhh, National Grid data from https://data.nationalgrideso.com/demand/historic-demand-data Raw data now added again for comparison of pre and post cleaning - to allow for training of additional cleaning methods. If using Microsoft Excel, the T between the date and time can be removed using the =SUBSTITUTE() command - and substitute "T" for a space " " _____________________________________________________________________________________________________ 2021-03-02: Version 4.0.0 was created. Due to a new interconnecter (IFA2 - https://en.wikipedia.org/wiki/IFA-2) being commissioned in Q1 2021, there is an additional column with data from National Grid - this is called 'POWER_NGEM_IFA2_FLOW_MW' in the espeni dataset. In addition, National Grid has dropped the column name 'FRENCH_FLOW' that used to provide the value for the column 'POWER_NGEM_FRENCH_FLOW_MW' in previous espeni versions. However, this has been changed to 'IFA_FLOW' in National Grid's original data, which is now called 'POWER_NGEM_IFA_FLOW_MW' in the espeni dataset. Lastly, the IO14 columns have all been dropped by National Grid - and potentially unlikely to appear again in future. 2020-12-02: Version 3.0.0 was created. There was a problem with earlier versions local time format - where the +01:00 value was not carried through into the data properly. Now addressed - therefore - local time now has the format e.g. 2020-03-31 20:00:00+01:00 when in British Summer Time. 2020-10-03: Version 2.0.0 was created as it looks like National Grid has had a significant change to the methodology underpinning the embedded wind calculations. The wind profile seems similar to previous values, but with an increasing value in comparison to the value published in earlier the greater the embedded value is. The 'new' values are from https://data.nationalgrideso.com/demand/daily-demand-update from 2013. Previously: raw and cleaned datasets for Great Britain's publicly available electrical data from Elexon (www.elexonportal.co.uk) and National Grid (https://demandforecast.nationalgrid.com/efs_demand_forecast/faces/DataExplorer). Updated versions with more recent data will be uploaded with a differing version number and doi All data is released in accordance with Elexon's disclaimer and reservation of rights. https://www.elexon.co.uk/using-this-website/disclaimer-and-reservation-of-rights/ This disclaimer is also felt to cover the data from National Grid, and the parsed data from the Energy Informatics Group at the University of Birmingham.

一篇发表于《Energy Strategy Reviews》(能源战略评论)的期刊论文详述了本数据集的构建方法。 https://www.sciencedirect.com/science/article/pii/S2211467X21001280 2023年3月15日:发布8.0.1版本,此为重大重写版本,列名现已包含单位与数据类型。此外,抽水蓄能数据新增了2012年起的充电值(即抽水蓄能机组充电时的负值),以及此前已有的发电正值(放电时的数值)。目前暂不再提供原始未清洗版本的数据。 2023年1月6日:发布7.0.0版本,新增了通过英吉利海峡隧道连接英国与法国的Eleclink(电力链路)跨境输电线路数据(数据来源:https://www.eleclink.co.uk/index.php)。此版本取代此前所有版本,因Eleclink历史数据现已纳入数据集(包括ESPENI总量统计中)。 2021年9月9日:发布6.0.0版本,新增了连接英国与挪威的North Sea Link(北海链路,NSL)跨境输电线路数据(数据来源:https://www.northsealink.com)。请勿使用此前的5.0.4版本,该版本存在跨境输电数据在2021年夏季为静态值的错误。 2021年5月5日:发布5.0.0版本。日期时间格式现已采用ISO 8601标准(日期与时间之间使用大写字母'T'分隔),取代此前使用空格分隔的格式(符合RFC 3339标准),并新增时区偏移以区分协调世界时(UTC)与本地时间。兆瓦(MW)数值现已全部以整数格式存储,而非浮点型。数据来源一如既往:Elexon数据取自www.elexonportal.co.uk/fuelhh,英国国家电网(National Grid)数据取自https://data.nationalgrideso.com/demand/historic-demand-data。本次更新重新加入原始数据,用于对比清洗前后的效果,以便训练额外的清洗方法。若使用Microsoft Excel,可通过=SUBSTITUTE()函数将日期时间中的'T'替换为空格" "。 _____________________________________________________________________________________________________ 2021年3月2日:发布4.0.0版本。由于2021年第一季度启用了新的跨境输电线路IFA2(具体信息见https://en.wikipedia.org/wiki/IFA-2),数据集新增一列来自英国国家电网的相关数据,在espeni数据集中命名为`POWER_NGEM_IFA2_FLOW_MW`。此外,英国国家电网已移除此前用于对应`POWER_NGEM_FRENCH_FLOW_MW`列的`FRENCH_FLOW`列名,该字段在英国国家电网原始数据中现已更改为`IFA_FLOW`,因此在espeni数据集中对应命名为`POWER_NGEM_IFA_FLOW_MW`。最后,英国国家电网已移除所有IO14相关列,未来大概率不会重新加入。 2020年12月2日:发布3.0.0版本。此前版本存在本地时间格式问题,即`+01:00`时区偏移未能正确写入数据,现已修复。英国夏令时期间,本地时间格式现已调整为例如`2020-03-31 20:00:00+01:00`。 2020年10月3日:发布2.0.0版本,因英国国家电网对嵌入式风电计算的底层方法进行了重大调整。风电剖面曲线与此前数值趋势相近,但嵌入式风电数值越高,与早期发布值的差距越大。新版数据取自2013年起的https://data.nationalgrideso.com/demand/daily-demand-update。 此前,本数据集包含英国公开可得的电力数据,原始与清洗后的数据集均来自Elexon(www.elexonportal.co.uk)与英国国家电网(https://demandforecast.nationalgrid.com/efs_demand_forecast/faces/DataExplorer)。后续将通过不同版本号与数字对象唯一标识符(DOI)上传包含更新数据的新版本。 所有数据的发布均符合Elexon的免责声明与权利保留条款,详情见https://www.elexon.co.uk/using-this-website/disclaimer-and-reservation-of-rights/。该免责声明同样适用于英国国家电网提供的数据,以及伯明翰大学能源信息学小组解析后的数据。

提供机构:
Zenodo
创建时间:
2023-06-01
二维码
社区交流群
二维码
科研交流群
商业服务