Change the setup ready for the next experiment (small beam, install cryostream) Debug the Bliss problems from last time the fluo detector was used. Measure a couple of test samples later in the evening/night: Cu₂(PO₄)OH for crystal structure refinement Re-measure the grid for detector spatial corrections for both pco1 and marana3; Complete the configuration of the DCT big beamstop rack (the small beamstop rack still misses out-of-beam configuration, while the rest is done); DAI to fix the tomo and lima > flip stories, to be consistent with all other tomo beamlines Measure some facetted quartz crystals