five

Resource-Constrained Multi-Project Reactive Scheduling Problem with New Project Arrival

收藏
IEEE2026-04-17 收录
下载链接:
https://ieee-dataport.org/documents/resource-constrained-multi-project-reactive-scheduling-problem-new-project-arrival-1
下载链接
链接失效反馈
官方服务:
资源简介:
Reactive project scheduling is an important branch of project scheduling under uncertainty. This paper proposes a resource-constrained multi-project reactive scheduling problem (RCMPRSP) with new project arrival to minimize the adjustment cost of the baseline schedule while achieving the deterministic multi-project scheduling goal. Although the RCMPRSP aims to minimize the adjustment cost, it adds a constraint to ensure that the reactive schedule is one of the schedules with shortest possible make-span after new project arrival. Therefore, the make-span and cost can both be optimized during when the multi-project schedule must be reactive scheduled due to new project arrival. Therefore, this scheduling problem has two stages. In the fifirst stage, the shortest make-span is obtained by fully rescheduling the multi-project after new project arrival. If the new project has a higher priority, the new project will be prioritized for implementation. Otherwise, the new project will be delayed. In the second stage, the multi-project is rescheduled to minimize the adjustment cost of the baseline schedule after new project arrival. The exact solution is implemented on IBM ILOG CPLEX Optimization Studio. It is found in the experiments that the CPLEX execution effificiency is acceptable for activity numbers below 80. The results of computational experiments demonstrate that the proposed method has distinct advantages over existing methods.
提供机构:
Lin, Jiali
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作