Data availability Optimized inventory control for zero waste in new product development
收藏官方服务:
资源简介:
This data elucidates the research focus using the ABC method, the distribution of lead times based on material types, and the comparative analysis between initial and proposed conditions.
本数据集阐明了采用ABC分类法(ABC method)明确的研究重点、基于物料类型的交货提前期分布情况,以及初始条件与拟议条件之间的对比分析。
提供机构:
Zenodo创建时间:
2024-07-12



