DC fast charging stations that do not meet NEVI but within 1-mile of a corridor March 2024
收藏data.gov2024-09-14 收录
数据链接:
官方服务:
资源简介:
Locations of DC fast charging stations that do not meet NEVI power-level or port count requirements (as of March 2024) but are within 1-mile of a corridor.A data...
本数据集涵盖截至2024年3月,不符合国家电动汽车基础设施计划(National Electric Vehicle Infrastructure, NEVI)功率等级或充电接口数量要求,且处于某条走廊沿线1英里范围内的直流快充充电站(DC fast charging stations)点位。原文后续内容截断为"A data..."
提供机构:
State of California


