遇见数据集

Table E- 0 - 5 in Saidabad Water Treatment Plant Project, Phase III

收藏
Zenodo2025-12-28 更新2026-05-26 收录
官方服务:

资源简介:

Table E-0-5: Different Options wise Raw Water Transmission Route Length (new table) OptionsCommon length from Haria intake to Demra Circle for all phasesAdditional length from Demra Circle to SWTP Transmissi Transmission on Main for Main for Phase-I & Phase-III IITotal length from Haria intake to SWTP Transmissi Transmissi on Main for on Main for Phase-I & Phase-III IITotal length of pipeline for Phase-I, II & III(km)(km)(km)(km)(km)(km)Option 119.23.955.4923.1524.6947.84Option 219.205.4919.224.6943.89Option 319.23.956.04523.1525.2548.4Option 419.24.786.04523.9825.2549.23Option 519.206.04519.225.2544.45

表E-0-5:不同方案下原水输送线路长度(新表) | 方案 | 全阶段哈里亚取水口至代姆拉环路通用长度(km) | 代姆拉环路至一、三期SWTP主干输水管线附加长度(km) | 哈里亚取水口至SWTP主干输水管线总长度(km) | 哈里亚取水口至SWTP主干输水管线一期总长度(km) | 一、二、三期管道总长度(km) | | ---- | ---------------------------------------- | ---------------------------------------- | ---------------------------------------- | ---------------------------------------- | ------------------------ | | 方案1 | 19.2 | 3.95 | 5.49 | 23.15 | 47.84 | | 方案2 | 19.2 | 0.549 | 5.49 | 19.2 | 43.89 | | 方案3 | 19.2 | 3.95 | 6.045 | 23.15 | 48.4 | | 方案4 | 19.2 | 4.78 | 6.045 | 23.98 | 49.23 | | 方案5 | 19.2 | 0.6045 | 19.2 | 25.25 | 44.45 |

创建时间:
2025-11-27
二维码
社区交流群
二维码
科研交流群
商业服务