CAPACITY OPTIMIZATION OF CNC MACHINING CENTERS IN HIGH-MIX LOW-VOLUME MANUFACTURING: AN INTEGRATED SIMULATION AND SCHEDULING APPROACH
收藏资源简介:
High-mix low-volume (HMLV) manufacturing environments face persistent challenges in achieving high utilisation of CNC machining centres while simultaneously meeting delivery due-dates for diverse, low-batch-size orders. This dissertation presents an integrated framework combining discrete-event simulation (DES), analytical capacity modelling, and a modified Genetic Algorithm (GA) scheduling optimiser to maximise throughput and minimise makespan in a real-world HMLV job shop equipped with seven CNC machining centres of varying capability tiers. A capacity model based on Overall Equipment Effectiveness (OEE) and utilisation rate analysis was developed and calibrated against 18 months of production data from a precision parts manufacturer in Tashkent, Uzbekistan. Bottleneck machines were identified using the Theory of Constraints (TOC) methodology, revealing that two 5-axis centres (OEE = 61.3%) were limiting shop-floor throughput by an estimated 23%. A DES model built in Siemens Tecnomatix Plant Simulation was validated against historical key performance indicators (KPIs) within ±4.8% for throughput and ±6.1% for average flow time. The GA scheduler, operating on a 48- hour rolling horizon, reduced average job tardiness by 38.4%, increased average machining centre utilisation from 67.2% to 81.9%, and improved OEE of bottleneck centres from 61.3% to 76.8% through optimised preventive maintenance windows and setup-time reduction strategies. Annual capacity gain equivalent to 1.7 additional machine-shifts per day was demonstrated without capital investment. The framework provides a transferable decision-support tool for HMLV manufacturers seeking productivity improvement through data-driven scheduling.
多品种小批量(High-mix low-volume, HMLV)制造环境长期面临着兼顾提升数控加工中心(CNC machining centres)利用率与按时交付多样化小批量订单的双重挑战。本论文提出一套集成化框架,整合离散事件仿真(discrete-event simulation, DES)、解析产能建模与改进型遗传算法(modified Genetic Algorithm, GA)调度优化器,旨在为配备7台不同性能等级数控加工中心的真实HMLV单件车间实现产能最大化与制造周期(makespan)最小化。基于设备综合效率(Overall Equipment Effectiveness, OEE)与利用率分析的产能模型已完成开发,并通过乌兹别克斯坦塔什干一家精密零件制造商18个月的生产数据完成校准。研究采用约束理论(Theory of Constraints, TOC)方法识别瓶颈机床,结果显示两台OEE为61.3%的五轴加工中心(5-axis centres)预估会使车间整体产能降低23%。基于西门子Tecnomatix Plant Simulation搭建的DES模型,通过历史关键绩效指标(Key Performance Indicators, KPIs)完成验证,其产能预测误差控制在±4.8%以内,平均流转时间预测误差控制在±6.1%以内。采用48小时滚动调度周期的GA调度器,通过优化预防性维护窗口与换型时间缩减策略,将平均工件拖期率降低38.4%,将数控加工中心平均利用率从67.2%提升至81.9%,并将瓶颈机床的OEE从61.3%提升至76.8%。实验验证表明,该方案无需新增资本投入即可实现相当于每日额外1.7个机加工班次的年度产能增益。本框架可为希望通过数据驱动调度提升生产效率的HMLV制造商提供可迁移的决策支持工具。