资源简介:

In compliance with Section 106 of the NHPA, the Bureau of Reclamation (Reclamation), Phoenix Area Office (PXAO) began cultural resource surveys along the Central Arizona Project (CAP) main stem alignment shortly after the CAP was authorized. For the next 25 years, various cultural resource management contractors conducted inventories of the CAP, recording several hundred archaeological sites. From the 1970s to the 1980s, some of these sites were tested and/or excavated as mitigation for the construction of the CAP main stem canal. While many sites were determined eligible or not eligible for the National Register of Historic Places (Register), some did not receive eligibility determinations and some were located outside of the construction corridor and not affected by construction activities. The legacy survey data and site records from these various investigations have a number of errors and are sometimes contradictory. In an effort to better manage cultural resources on Reclamation land, PXAO has developed an archaeological site database for the CAP canal. The database was developed using all the previous main stem survey data; however, the Register eligibility status of the majority of these sites was unknown following completion of the CAP. Additionally, an unknown number of sites were either destroyed by construction or excavation, while others are no longer within Reclamation’s CAP ROW. It is necessary that the database accurately reflects the current Register eligibility status of all archaeological sites within the CAP ROW to ensure that PXAO can effectively manage these sites. To this end, PXAO has been updating its database and conducted consultation with the Arizona State Historic Preservation Office (SHPO) in 2015, seeking to resolve the eligibility status of sites within the CAP ROW. Following this consultation, the SHPO and PXAO agreed that based on the assessment data provided, further work was required on 117 sites along the Fannin-McFarland and Tucson Aqueducts. For 24 sites determined eligible for the Register, the maps from the original surveys were insufficient. For another 93 sites, the data provided was insufficient to determine whether a site was eligible or ineligible for inclusion in the Register. During ACS’ efforts to relocate 117 previously recorded sites along the Fannin-McFarland and Tucson Aqueducts, eligibility for 10 sites could not be determined and so eligibility testing was conducted at these 10 sites to determine Register eligibility or the extent to which subsurface deposits are likely present with the CAP ROW. Following this work, additional survey was conducted in selected portions of the CAP corridor to try and relocate 15 sites that could not be found due to destruction or misplotting. This file is consists of the project area shapefiles.

为遵守《国家历史保护法》(National Historic Preservation Act, NHPA)第106条之规定,美国垦务局(Bureau of Reclamation)菲尼克斯地区办事处(PXAO)在亚利桑那中部工程(Central Arizona Project, CAP)获批后不久,即沿其主干渠轴线启动文化资源勘查工作。后续25年间,多家文化资源管理承包商对CAP全域开展普查,累计记录数百处考古遗址。20世纪70年代至80年代,部分遗址被实施测试性发掘或正式发掘,作为CAP主干渠建设的文物影响减缓措施。尽管多数遗址已被认定符合或不符合《国家历史遗迹名录》(National Register of Historic Places, Register)收录资格,但仍有部分遗址未完成资格判定,另有部分遗址位于建设廊道范围之外,未受施工活动影响。上述各类调查遗留的勘查数据与遗址记录存在诸多错误,且部分内容相互矛盾。为更好地管理垦务局管辖范围内的文化资源,PXAO为CAP渠道构建了专属考古遗址数据库。该数据库整合了此前所有主干渠勘查数据集,但在CAP建成后,多数遗址的名录收录资格状态仍不明确。此外,未知数量的遗址因建设或发掘遭到破坏,另有部分遗址不再隶属于垦务局管辖的CAP用地通行权(Right-of-Way, ROW)范围。为确保数据库能够准确反映CAP用地通行权范围内所有考古遗址当前的名录收录资格状态,以保障PXAO可对这些遗址实施有效管理,亟需对数据库进行更新完善。为此,PXAO于2015年启动数据库更新工作,并与亚利桑那州历史保护办公室(Arizona State Historic Preservation Office, SHPO)开展磋商,旨在明确CAP用地通行权范围内各遗址的收录资格。经此次磋商,SHPO与PXAO达成共识:依据现有评估数据,范宁-麦克法兰德(Fannin-McFarland)输水渠与图森输水渠沿线的117处遗址需开展进一步工作。其中24处已被初步认定符合名录收录资格的遗址,原勘查所用的测绘图纸资料不足;另有93处遗址,现有数据不足以判定其是否符合名录收录资格。在ACS对范宁-麦克法兰德与图森输水渠沿线的117处已记录遗址进行重新定位的过程中,有10处遗址的资格无法判定,因此项目团队对这10处遗址开展了资格测试,以明确其名录收录资格,或确定CAP用地通行权范围内地下遗存的可能分布范围。此项工作完成后,团队还对CAP廊道的选定区域开展补充勘查,试图找回因遭到破坏或测绘点位误差而未被找到的15处遗址。本数据集包含本项目涉及区域的形状文件(shapefiles)。

创建时间:
2023-06-28
二维码
社区交流群
二维码
科研交流群
商业服务