Utah FORGE: Phase 1a Tensor Strainmeter Data for the April, 2022 Stimulation of Well 16A(78)-32
收藏OpenEI2026-03-14 收录
下载链接:
https://data.openei.org/submissions/7528
下载链接
链接失效反馈官方服务:
资源简介:
Data from two Tensor Optical Fiber Strainmeters that were operational during Stages 1, 2, and 3 of the April, 2022 stimulation of well 16A(78)-32. Each csv file contains data from each stimulation stage (stage1, stage2, stage3) for both Phase 1a strainmeter installations (FS01, f...



