Varroa Treatment Arc — Stabilisation Phase (from 10 May 2026)
收藏官方服务:
资源简介:
This dataset contains acoustic recordings and spectrograms from the stabilisation phase following Formic Pro treatment applied to a honey bee colony on 30 April 2026. After the early recovery period (3–4 May), no recordings were captured between 5–9 May due to intermittent equipment failure. The equipment was replaced during this time. The next stable dataset begins on 10 May. These recordings show the colony regaining consistent harmonic structure, midband strength, and organised work‑tone patterns. This phase marks the transition from early recovery to a stable post‑treatment acoustic profile.
提供机构:
Zenodo创建时间:
2026-06-20



