Two-Way Time (TWT) grids from the Rødby project
收藏GEUS Dataverse2023-01-01 更新2026-04-13 收录
下载链接:
https://dataverse.geus.dk/citation?persistentId=doi:10.22008/FK2/LVKTLO
下载链接
链接失效反馈官方服务:
资源简介:
GEUS’ gridded interpretations in two-way time of the Rødby structure from the CCS2022–2024 project. The grids in two-way time from key seismic horizons of this folder are based on 2D seismic data acquired in 2023 (the GEUS2023-ROEDBY survey) and legacy seismic data and published as of December 11th, 2023. The work will be reported in a GEUS report in 2024. The grids of key horizons are provided for reference of the initial maturation of the structure. GEUS disclaims any responsibility of the grids, their exactness as well as the applicability of the data to the customer’s purpose. Any use of the interpretations from this folder are not the responsibility of GEUS. Please also refer to GEUS terms of delivery (GEUS_Terms_of_Delivery_20230919.pdf, available in this folder). The seismic interpreted grids are made in Petrel (2022 version) in two-way time (negative values as standard of Petrel), with a grid size of 250 X 250 meter, and exported from Petrel (Zmap+) as .dat (ASCII) files. All grids are unsmoothed. Contents of this folder (TWT grids and GEUS’ terms of delivery): Roedby_Top Oerslev Fm_twt_250x250mGrid_geus2023.dat Roedby_Top Bunter Sandstone Fm_twt_250x250mGrid_geus2023.dat Roedby_Top Bunter Shale Fm_twt_250x250mGrid_geus2023.dat GEUS_Terms_of_Delivery_20230919.pdf
创建时间:
2023-01-01



