<b>Blocking scheduling for three-stage remanufacturing system with</b><b>the consideration of machine deterioration and</b><b>maintenance strategy using</b><b>modified monarch butterfly optimization algorithm</b>
收藏数据链接:
官方服务:
资源简介:
This is the experimental data of the manuscript entitled "<b>Blocking scheduling for three-stage remanufacturing system with </b><b>the consideration of machine deterioration and </b><b>maintenance strategy using </b><b>modified monarch butterfly optimization algorithm</b>".
本数据集为题为《采用改进型帝王蝶优化算法(modified monarch butterfly optimization algorithm)求解考虑机器退化与维护策略的三阶段再制造系统阻塞调度问题》的手稿的实验数据。
提供机构:
figshare创建时间:
2024-07-28



