Planning for a future Murray River crossing at Swan Hill : community feedback summary report
收藏Research Data Australia2024-12-14 收录
下载链接:
https://researchdata.edu.au/planning-future-murray-summary-report/1765611
下载链接
链接失效反馈官方服务:
资源简介:
This report summarises Transport for NSW’s consultation with the Swan Hill and Murray Downs community and stakeholders about the preferred alignment of a future Murray River crossing at Swan Hill. Between Monday 14 September and Friday 13 November 2020, Transport for NSW called for community feedback and comments about two options for the alignment of a future bridge in Swan Hill. These two options are: 1. Option 9a, located about 120 metres upstream (east) of the existing bridge, and 2. McCallum Street Option, located at the existing bridge alignment at McCallum Street. All feedback received has been reviewed and is summarised in this report to help inform future planning for a future bridge.
本报告汇总了新南威尔士州交通局(Transport for NSW)就天鹅山(Swan Hill)未来墨累河(Murray River)跨河通道的优选线路,与天鹅山及默里当斯(Murray Downs)社区、利益相关方开展的咨询调研工作。2020年9月14日(周一)至11月13日(周五)期间,新南威尔士州交通局(Transport for NSW)针对天鹅山未来桥梁的两种线路方案,公开征集社区反馈与意见。该两项方案具体为:1. 9a号方案:选址于既有桥梁上游(东侧)约120米处;2. 麦卡勒姆街方案:选址于麦卡勒姆街处的既有桥梁线路位置。本次收到的全部反馈均已完成审核,并整理汇总至本报告,以期为未来桥梁的后续规划提供参考依据。
提供机构:
data.nsw.gov.au