Table- 8.2. Institutional roles and responsibilities in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
收藏资源简介:
Table-8.2. Institutional roles and responsibilities Project stageResponsible organizationResponsibilitiesPre-constructionEGCB Ltd. (with the assistance from project consultant)i. Prepare EIA consistent with GOB and WB requirements ii. Conduct public consultation during EIA iii. Fulfill GOB requirements iv. Make EIA reports available to the web sitev. Incorporate mitigation measures into engineering design and technical specificationvi. Incorporate environmental mitigation and monitoring measures into contract documentvii. Update the EMP (mitigation measures, monitoring program, institutional responsibilities, costs, etc.) during the detailed design stage.ConstructionEGCB Ltd.,i. With the assistance of project consultants, ensure implementation of environmental management measures at each stage of the construction and update the EMP as necessary.ii. Complain Redresser Committee will attend any kind of environmental and social complain arising from the residents and workers during construction and operation phases of the proposed project.Project consultanti. Review the construction site management plan to be prepared by the contractor.ii. Provide support to EGCB in conducting routine monitoring of implementation of mitigation
表8.2 机构角色与职责 项目阶段 负责机构 职责 施工前期 EGCB有限公司(在项目咨询方协助下) i. 编制符合孟加拉国政府(Government of Bangladesh, GOB)与世界银行(World Bank, WB)要求的环境影响评价(Environmental Impact Assessment, EIA); ii. 在环境影响评价阶段开展公众咨询; iii. 满足孟加拉国政府相关合规要求; iv. 将环境影响评价报告公开至官方网站; v. 将环境减缓措施纳入工程设计与技术规范; vi. 将环境减缓与监测措施纳入合同文件; vii. 在详细设计阶段更新环境管理计划(Environmental Management Plan, EMP,涵盖减缓措施、监测方案、机构职责、成本等内容)。 施工阶段 EGCB有限公司 i. 在项目咨询方协助下,确保在施工各阶段落实环境管理措施,并按需更新环境管理计划; ii. 投诉受理委员会(Complain Redresser Committee)将处理拟建项目施工与运营阶段内居民及工作人员提出的各类环境与社会投诉。 项目咨询方 i. 审核承包商编制的施工现场管理计划; ii. 为EGCB开展减缓措施落实情况的日常监测提供支持。