Electricity Networks: Baseline: UKPN Secondary Substation Demand Headroom
收藏资源简介:
Author: UK Power Networks Creation date: 2025 Date of source data harvest: 15/05/2025 Temporal coverage: 2024 Spatial Resolution: Secondary Substation Supply Area Geometry: Polygon Source data URL: UKPN Secondary Substation Distribution Areas Data terms of use: Data freely available for download and re-use, with appropriate attribution. Data attribution: Dataset processed by Arup as part of the Outer East London sub-regional LAEP, 2025. - UK Power Networks, 2025. Workflow Diagram: N/A Comments: The data and analysis developed for the sub-regional LAEP was undertaken using data available at the time and will need to be refined for a full Phase 2 LAEP. Whilst every effort has been made to ensure the quality and accuracy of the data, the Greater London Authority is not responsible for any inaccuracies and/or mistakes in the information provided.
作者:英国电力网络(UK Power Networks) 创建日期:2025年 源数据采集日期:2025年5月15日 时间覆盖范围:2024年 空间分辨率:二级变电站供电区域 几何类型:多边形(Polygon) 源数据网址:英国电力网络(UKPN)二级变电站供电区域数据集 数据使用条款:可免费下载并重复使用本数据,但需标注恰当的引用来源。 数据引用说明:本数据集由奥雅纳(Arup)作为2025年伦敦外东部次区域地方能源行动计划(LAEP)的一部分进行处理,原数据版权归英国电力网络公司所有,2025年。 工作流程图:无 注释:为次区域LAEP开发的本数据集及相关分析均基于采集时可用的数据完成,需针对完整的第二阶段LAEP进行优化完善。尽管已尽最大努力确保数据的质量与准确性,但大伦敦市政府不对所提供信息中的任何不准确之处或错误承担责任。



