Songhua River Regime
收藏资源简介:
Methods 1) Measure the selected cross-section of the river channel near the hydrological station. 2) Determine the bankfull water level based on the bank of the measured cross-section. 3) The bankfull discharge is determined according to the water level-discharge relationship of the hydrological station. Usage Notes The parameter of the characteristic length l<sub>d</sub> in the second page can be get through the calculation of the sum of the bed load and suspended load transport rate.
研究方法:1) 对水文站(hydrological station)附近选定的河道横断面(river channel cross-section)进行测量;2) 基于实测横断面的河岸确定平滩水位(bankfull water level);3) 根据水文站的水位-流量关系推求平滩流量(bankfull discharge)。 使用说明:第二页中的特征长度(characteristic length)l<sub>d</sub>的参数,可通过推移质输沙率(bed load transport rate)与悬移质输沙率(suspended load transport rate)的总和计算得到。