Induction furnace for POLARIS; second in-beam test
收藏B2FIND2026-04-25 收录
下载链接:
https://b2find.eudat.eu/dataset/bda40405-7925-530a-a6b5-668b74967994
下载链接
链接失效反馈官方服务:
资源简介:
The induction furnace build for POLARIS was tested in-beam for the first time in November 2018.Since then adjustments has been made to the copper coils which has been coated...
为POLARIS搭建的感应炉于2018年11月首次完成束流测试。此后,针对已完成镀层处理的铜线圈开展了调整工作。



