遇见数据集

Induction furnace for POLARIS; second in-beam test

收藏
B2FIND2026-04-25 收录
官方服务:

资源简介:

The induction furnace build for POLARIS was tested in-beam for the first time in November 2018.Since then adjustments has been made to the copper coils which has been coated...

为POLARIS搭建的感应炉于2018年11月首次完成束流测试。此后,针对已完成镀层处理的铜线圈开展了调整工作。

二维码
社区交流群
二维码
科研交流群
商业服务