five

HUN Baseline CRDP mine timelines v01

收藏
Research Data Australia2025-12-20 收录
下载链接:
https://researchdata.edu.au/hun-baseline-crdp-timelines-v01/3794593
下载链接
链接失效反馈
官方服务:
资源简介:
## **Abstract** \n\nThe dataset was compiled by the Bioregional Assessment Programme from multiple components found in references but without the use of source datasets. The processes undertaken to compile this dataset are described in the History field in this metadata statement.\n\n\n\nTable contains start and end dates for baseline and CRDP mines in the Hunter subregion.\n\n## **Purpose** \n\nThe dataset was compiled for purposes of generating time-line figure for HUN 2.3.4 to show the intensity and duration of mining activity in the Hunter subregion under the baseline and CRDP.\n\n## **Dataset History** \n\nIt is based on information compiled in Hodgkinson et al (2015) from a comprehensive review of mining reports for Hunter subregion mines. Some dates were subsequently modified during consultation with mining company representatives and during the product review process. The start dates were important for determining whether a mining operation was baseline or CRDP.\n\n\n\nHodgkinson JH, Pinetown KL, Wilkes PG, Khanal M, Rachakonda PK and Marvanek SP (2015) Coal and coal seam gas resource assessment for the Hunter subregion. Product 1.2 for the Hunter subregion from the Northern Sydney Basin Bioregional Assessment. Department of the Environment, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/NSB/HUN/1.2.\n\n## **Dataset Citation** \n\nBioregional Assessment Programme (2016) HUN Baseline CRDP mine timelines v01. Bioregional Assessment Source Dataset. Viewed 07 June 2018, http://data.bioregionalassessments.gov.au/dataset/d5e16985-2d25-4df9-94c4-60262493bb39.

## **摘要** 本数据集由生物区域评估计划(Bioregional Assessment Programme)基于参考文献中的多个组分编制而成,未使用原始源数据集。本数据集的编制流程详见本元数据声明中的“历史”字段。 本表包含亨特次区域(Hunter subregion)内基线矿山与CRDP矿山的起始与结束日期。 ## **用途** 本数据集的编制目的是为HUN 2.3.4生成时间线图,用以展示亨特次区域在基线情景与CRDP框架下采矿活动的强度与持续时长。 ## **数据集历史** 本数据集基于Hodgkinson等人(2015)编制的信息,该信息源自对亨特次区域矿山采矿报告的全面梳理。后续在与矿山企业代表磋商以及产品评审流程中,部分日期得到了修正。起始日期是判定某采矿作业归属基线矿山还是CRDP矿山的核心依据。 Hodgkinson JH, Pinetown KL, Wilkes PG, Khanal M, Rachakonda PK 与 Marvanek SP (2015) 《亨特次区域煤炭与煤层气资源评估》:北悉尼盆地生物区域评估亨特次区域第1.2号成果。澳大利亚环境部、澳大利亚气象局(Bureau of Meteorology)、澳大利亚联邦科学与工业研究组织(CSIRO)及澳大利亚地质科学局(Geoscience Australia)。http://data.bioregionalassessments.gov.au/product/NSB/HUN/1.2. ## **数据集引用** 生物区域评估计划(Bioregional Assessment Programme)(2016) 《亨特次区域基线与CRDP矿山时间线 v01》。生物区域评估源数据集。2018年6月7日查阅,http://data.bioregionalassessments.gov.au/dataset/d5e16985-2d25-4df9-94c4-60262493bb39.
提供机构:
data.gov.au
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作