five

Two-stage Planning for Electricity-Gas Coupled Integrated Energy System with CCUS Considering Carbon Price Uncertainties

收藏
Figshare2021-07-04 更新2026-04-28 收录
下载链接:
https://figshare.com/articles/dataset/Two-stage_Planning_for_Electricity-Gas_Coupled_Integrated_Energy_System_with_CCUS_Considering_Carbon_Price_Uncertainty/14906655
下载链接
链接失效反馈
官方服务:
资源简介:
In this article, we propose two-stage planning models for Electricity-Gas Coupled Integrated Energy System (EGC-IES), in which traditional thermal power plants (TTPPs) are considered to be retrofitted into carbon capture power plants (CCPPs), with power to gas (PtG) coupling CCPPs to gas system. The sizing and siting of carbon capture, utilization and storage (CCUS)/PtG facilities, as well as the operation cost of TTPPs/CCPPs/gas sources/PtG, are all considered in the proposed model, including penalty on carbon emissions and revenue of CCUS. With changing policy on climate change and carbon emission regulation, the uncertainties of carbon price and carbon tax are also analyzed and considered in the proposed planning model. The deterministic planning, stochastic planning, and robust planning methods are introduced to verify mutually through economic and carbon indices. The proposed methods’ effectiveness in reducing carbon emissions, increasing CCUSs’ profit from EGC-IES are demonstrated through various cases and discussions.
创建时间:
2021-07-04
二维码
社区交流群
二维码
科研交流群
商业服务