Wind farms, in the region Centre -Val de Loire (R24) as at 27 September 2021.
收藏资源简介:
Data downloaded from the DREAL Centre -Val de Loire website https://carmen.developpement-durable.gouv.fr/11/eolien2.map#. A wind farm is composed of one or more wind turbines producing electricity. A park requires one or more building permits and is subject to an administrative procedure, conducted in DDT. A park can only have one operator. The provisions of the Environment Grenelle require the construction of wind farms: — a minimum of 5 machines for installations whose application for a building permit was submitted after the publication of Law 2010-788 of 12/07/2010; — a wind turbine of less than 30 metres and less than 250 kW. The definition of wind farm has no administrative or regulatory basis. It is a purely abstract class corresponding to an aggregate of wind turbines. The polygonal geometry of a wind farm is only a proposed artifice for mapping wind turbines on a small scale. A wind farm is therefore represented by arbitrary boundaries and does not correspond to any administrative or physical hold on the ground.
本数据集的数据源自卢瓦尔河谷中心大区区域环境、规划与住房局(DREAL)官网:https://carmen.developpement-durable.gouv.fr/11/eolien2.map#。 风电场由一台或多台用于发电的风力涡轮机构成。一座风电场需取得一项或多项建筑许可,并需遵循由领土管理总局(DDT)主导的行政审批流程,且仅可拥有一名运营主体。 《格勒奈尔环境法案》对风电场建设作出如下规定: —— 对于2010年7月12日第2010-788号法律公布后提交建筑许可申请的风电项目,需至少配备5台风力涡轮机; —— 单台风力涡轮机的高度需低于30米且额定功率小于250千瓦。 风电场的定义并无行政或法规层面的依据,其仅为纯粹的抽象分类,对应风力涡轮机的集合体。风电场的多边形几何边界仅为一种用于小规模测绘风力涡轮机的拟制性手段,因此风电场以任意划定的边界进行表征,并不对应任何实地的行政管辖或物理权属范围。



