five

Water quality, plume modelling and tracking before and during dredging in Mermaid Sound, Dampier W.A.

收藏
Research Data Australia2024-12-21 收录
下载链接:
https://researchdata.edu.au/water-quality-plume-dampier-wa/680299
下载链接
链接失效反馈
官方服务:
资源简介:
A water quality monitoring program established to coincide with the Mermaid Sound dredging projects in 2004 for assessed turbidity, suspended sediments and other parameters (Dissolved Oxygen, pH, Temperature, Salinity) every three days to start then weekly. To assist in locating monitoring sites - a model of sediment transport was developed. Also throughout the dredging program aerial surveys of the dredging location, monitoring locations and surrounding areas were undertaken on a weekly basis. They were flown of the same day as the water monitoring trip to allow for cross-referencing of visual observations and actual data.

本水质监测项目为配合2004年美人鱼湾(Mermaid Sound)疏浚工程而设立,旨在监测浊度(turbidity)、悬浮沉积物(suspended sediments)及溶解氧(Dissolved Oxygen)、pH值、水温(Temperature)、盐度(Salinity)等参数,初始监测频率为每三日一次,后续调整为每周一次。 为辅助确定监测点位,项目组开发了泥沙输运模型(sediment transport model)。在整个疏浚工程实施期间,项目组每周对疏浚作业区、监测点位及周边区域开展航空勘测(aerial surveys),且所有航空勘测均与水质监测采样于同日开展,以便实现目视观测结果与实测数据的交叉比对(cross-referencing)。
提供机构:
Australian Ocean Data Network
二维码
社区交流群
二维码
科研交流群
商业服务