Costs data used to estimate potential earnings from trophy hunting.
收藏Figshare2015-12-02 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/_Costs_data_used_to_estimate_potential_earnings_from_trophy_hunting_/364198
下载链接
链接失效反馈官方服务:
资源简介:
aIn most countries, lease length is largely consistent among blocks, but in Mozambique, due to high variability in this measure, mean lease length ± SE reported by operators was used.bWe assumed (using data from the surveys) that 61±19.1% (mean ± SD) of running costs were fixed, and the remainder were variable.cDue to a small sample size, we used the Tanzanian mean value for start up and operating costs in Zambia, but used the minimum and maximum values from Zambia.
创建时间:
2015-12-02



