five

IAP-BIC: Invasive Alien Plants - Biomass Integrated Combined Gasification Cycle

收藏
Mendeley Data2024-01-31 更新2024-06-28 收录
下载链接:
https://api.odp.saeon.ac.za/catalog/SAEON/go/10.15493/BEA.DATA.10000032
下载链接
链接失效反馈
官方服务:
资源简介:
* Technical Challenges - Existing expertise and infrastructure in respect of `Working for Water` programmes in respect of harvesting and eradication, projects required for conversion to electricity. It may be simpler and less risky to generate new sources of renewable electricity rather than converting existing power stations to co-firing. * Cost Challenges - There may be as many as 40 viable projects, all having a 20-year lifetime - with significant capital investment required. * Policy Challenges - The projects are feasible and well aligned with existing expertise and infrastructure in respect of `Working for Water` programmes. Integration with DEA `Working for Energy` required and incorporation into IPP programmes needed. * Environmental Challenges - The net impact on greenhouse gas emissions is large, despite land use change effects, given the significant reduction in GHG as CO2 equivalents in comparison to coal.

- 技术挑战:现有针对'为水工作'(Working for Water)项目在收获与清除环节的专业知识与基础设施,以及需用于电力转化的相关项目。相较于将现有电站改造为混燃发电模式,开发全新的可再生电力来源或许更为简便且风险更低。 - 成本挑战:目前或存在多达40个具备可行性的项目,所有项目均设有20年运营周期,且需要巨额资本投入。 - 政策挑战:此类项目具备可行性,且与'为水工作'(Working for Water)项目现有的专业知识和基础设施高度契合。需与环境事务部(DEA)的'为能源工作'(Working for Energy)计划完成整合,并纳入独立发电商(IPP)计划当中。 - 环境挑战:尽管存在土地利用变化的影响,但相较于煤炭发电,该类项目可大幅减少以二氧化碳当量计的温室气体排放,因此对温室气体排放的净减排规模可观。
创建时间:
2024-01-31
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作